Największy na świecie niekomercyjny serwis geocachingowy
GeoŚcieżki - skupiające wiele keszy
Ponad 1000 GeoŚcieżek w Polsce!
Pełne statystyki, GPXy, wszystko za darmo!
Powiadomienia mailem o nowych keszach i logach
Centrum Obsługi Geokeszera wybierane przez Społeczność
100% funkcjonalności dostępne bezpłatnie
Przyjazne zasady publikacji keszy
You have to be logged-in in order to perform operations on this cache.
stats
Show cache statistics
Przesunięty tunel - OP80KX
first constructed, then moved
Owner: Maciek_B
This cache belongs to GeoPath!
Please log in to see the coordinates.
Altitude: 106 m. ASL.
 Region: Poland > mazowieckie
Cache type: Traditional
Size: Small
Status: Ready for Search
Time required: 0:10 h    Distance to travel: 0.20 km
Date hidden: 12-04-2014
Date created: 12-04-2014
Date published: 12-04-2014
Last modification: 27-04-2023
158x Found
1x Not found
3 notes
watchers 3 watchers
101 visitors
107 x rated
Rated as: Good
1 x recommended
This cache is recommended by: PaaaP
In order to view coordinates and
the map of caches
you must be logged in
Cache attributes

Go geocaching with children  Accessible for disabled  Bike  One-minute cache  Fixed by magnet 

Please read the Opencaching attributes article.
Description EN PL

The new Nowolazurowa street (this wonderful name is said to be not an official one yet) is covered with noise barriers beyond the limit of absurd (another cache is connected with this subject). But there is also another interesting fact about this street. It is the tunnel under the railway line Warszawa - Poznań, next to the station of Warszawa - Ursus Północny. What is so unusual about it ? The first fact is that is not perpendicular to the railway line, but skew. But the most interesting was the technology of its construction. The railway line is very busy, local trains to Błonie, Sochaczew and Łowicz pass it, as well as the express trains to Poznań or Berlin. So closing it for a long time could cause much problems for passengers. To minimise those difficulties an unusual operation was made. The concrete structure of the tunnel was initially constructed not in the target place, but a few metres away. Then, after closing the railway line, some fragment of it was disassembled, together with the banks. Then, the concrete base was constructed, and - what was the most interesting - the already prepared tunnel was transported to its place. Later the banks and the railway track were restored. Thanks to such method, the whole operation took just a bit more than one week (starting from the long weekend of 15th of August 2012 and few days after it). How it is possible that it was done so quickly ? Some explanation can be the fact that it was a part of a bigger road investment. Probably it was necessary to pay some compensations to the rail companies for closing the tracks and directing the trains to bypasses. So there was a pressure to finish it as quick as possible. Probably, if the investment had been done by the railway company itself, such hurry would not take place, everything would have been done with the full relax;)and passengers would probably have to ride through bypasses for a few months :)

Some photos and films from this unusual operation can be seen here:

http://www.skyscrapercity.com/showthread.php?t=528872&page=60

And the article (in Polish) about it is here:

http://tvnwarszawa.tvn24.pl/informacje,news,10-500-ton-wsuneli-pod-nasyp-16-godzinna-akcja-w-przyspieszeniu,55238.html

As one internet user noticed, the moving of the tunnel itself actually did not require huge power;)One man with a crowbar was enough;)(you can see it on the film above about 01:55).

Attention ! The cache is located in a fully accessible place, it is not dangerous to get it, you can reach it directly from the sidewalk. You should not even try to climb the railway escarpment and especially you should not cross the railway track - it is extremely dangerous and can result in death, because the traffic on this line is very intensive. The author of the cache and the owners of the service does not hold the responsibility for any potential actions of persons who would ignore this warnings and would try to step into the railway area.

Pictures
tunel
i z drugiej strony